EGI Document 1057-v12
MS418 Operational Level Agreements (OLAs) within the EGI production infrastructure
- Permalink:
- https://documents.egi.eu/document/1057
- Document #:
- EGI-doc-1057-v12
- Document type:
- Submitted by:
- Georgios Fergadis
- Updated by:
- Erika Swiderski
- Document Created:
- 14 Mar 2012, 14:05
- Contents Revised:
- 04 Jun 2012, 17:21
- Metadata Revised:
- 04 Jun 2012, 17:21
Viewable by:
- Public document
Modifiable by:
Quick Links:
Latest Version
EGI-doc-1057-v11
01 Jun 2012, 10:36 |
EGI-doc-1057-v10
30 May 2012, 09:38 |
EGI-doc-1057-v9
09 May 2012, 11:47 |
EGI-doc-1057-v2
15 Mar 2012, 10:50 |
EGI-doc-1057-v1
14 Mar 2012, 14:05 |
- Abstract:
- MS418 describes the purpose and content of the Resource Centre Operational Level Agreement and of the Resource Provider Operational Level Agreement. The EGI.eu OLA, which is currently being drafted, is also presented..
The document also provides information about the technical tools developed and deployed for service level monitoring. The further tool extensions that are still needed to report on performance of all main infrastructure services in the infrastructure, and the procedures involved in the availability calculation process are described.
- Files in Document:
-
- MS418 final (EGI-MS418-final.docx, 128.3 kB)
- Authors:
- Related Documents:
- EGI-doc-1131: Feedback on MS418
DocDB, Contact:
Document Database Administrators